Full Project – FACTOR AFFECTING POWER OUTAGE IN NIGERIA

Full Project – FACTOR AFFECTING POWER OUTAGE IN NIGERIA

Click here to Get this Complete Project Chapter 1-5

FACTOR AFFECTING POWER OUTAGE IN NIGERIA

ABSTRACT

This research work examines the factors affecting  power  outage in Nigeria.

Constants Power supply is the hallmark of a develop economy. Any nation whose energy need is epileptic in supply prolongs her development and risk-losing potential investors.

Nigeria with population of over 120 million people has for the past 40 years of establishment of National Electric Power Authority (NEPA)agency  empowered with the electricity generation, transmission and distribution, experience frequent  and persistent challenges and problems.

Presently the federal government has embarked on power  sector reforms with the aim of  improving the unpalatable scenario and in turn reduce the scope of monopoly control of the nations power industry. This work also look at the overall power sector reforms as well as evaluate the opportunities and challenges there and  while advocating introduction of management programme by Power Holding Company of Nigeria (PHCN?) a way of improving power supply .

CHAPTER ONE

1.0              INTRODUCTION

1.1        BACKGROUND OF THE STUDY

Constant Electricity Power  supply is the hallmark of National development with electric emerges the people  are  empowered to work  from the domestic level and the cottage  industries through and large scale  manufacturing complexes. In these days depriving  people of electric power is tan tantamount to risk of losing potential investors and also   prolong development.

The Power generation can be  through one of the following sources  of energy coal, oil or natural gas, hydro power  (water turbine), nuclear power (stream  turbine), solar-wind or water wave  turbine, solar thermal generator, solar voltaic generator, coal, oil, gas and hydro Power are  abundant in Nigeria.

Presently  Nigeria Mostly employ gas fired and hydroelectric Power bring that oil is too expensive and coal-fired station have gone moribund the maximum Power  consumption or  peak demand depends on the population and industrialization of a country. If the maximum supply meets the peak demand there is a surplus otherwise there is a shortfall.

However, in Nigeria, the Power supply system is run with a shortfall as demand  tends to exceeds supply.

The power holding company of Nigeria (PHCN) is responsible for generating, transmitting distributing and sells electric power to various  consumers  across the country. A major objective of PHCN naturally has been  to provide  regular  and uninterrupted power supply to electricity consumer nationwide.

There has  been study of power supply  systems as well as various aspects of their  operations, however very few have investigates  and documented in learned journals  the counterpart (factor affecting) of the system in Nigeria. The establishment and the growth of electricity in Nigeria dates back as far as  1896 when it was first produce in Lagos,  fifteen years after its introduction in England (Niger. Power Review, 1985). The total capacity of the generation used then was  60KW. In other words the maximum demand in 1896 was less  than 60KW  and then in 1946 the Nigeria government  electricity undertaking was established under the jurisdiction of the responsibility of (PWD) to take  over the responsibility of electricity supply in Lagos  State.  And in 1950  a central body was established by the legislative council which transferred electricity supply and development of the care of the body known as the electricity corporation of Nigeria (ECN). Other bodies like native Authorities and the Nigerian Electricity  Supply Company (NESCO) had  licenses  to produced  electricity in some locations in Nigeria.

Another body known as Niger Dams Authority (NDA) which was established by an  Act of parliament the Authority was responsible for the construction and maintenance of dams  and other works on the River Niger  and elsewhere  generating  electricity by means of water Power, improving  navigation and promoting  fish brines and irrigation the electricity produced by NDA was bold  to ECN for distribution and sales at unity voltage.

In April 1972, the operation of ECN/NDA were merged in anew organization known as the National Electric Power Authority (NEPA) since ECN  was mainly responsible for distribution and sales and NDA was created to build and run-generating station and transmission lines, the primary aim for merging the organization were  (Niger Power Review 1989)

The capacity in Kilowatt generated by each of the generating system inv various part of the country (Nigeria) has also been studied. The work which also examined the Nigerian Electricity marked and found that the annual growth rate of electricity average about 18 percent  still had low electricity consumption of 60KWH capita (1979 figure) which is less than 1 percent of industrialized countries. The work however pointed out that the low consumption capita in Nigeria is due to the fact that over 80 percent of the population normally resides  in the rural area where they have no access to electricity as well as low level of industrialization.

The solar and wind  energy resource in Nigeria was  investigated  and found that the annual mean of solar meter square  and global radiation is as high as 24mj per meter squared per day due to it good  geographical location latitude 4 degree and 14 degree north of the equator. Nigeria’s Power Company-Power Holding Company of Nigeria has an  installed  generating capacity of about 6GW but actual available output is less than 2.5GW Power  outage (black out) is frequent.

1.2    Aims and Objectives of the Study

This Paper looks into some recent major Power  outage in Nigeria and adequate examined the root causes and dynamic of this problem and possible recommendations for possible solution.

1.3       Significance of the Study

Electricity as a source of energy is vital to the growth and development of any economy. Its  significance arises from the impact it  has on infrastructure, a range of socio-economic activities and consequently on the country’s  standard of living. This means that transportation, communication, construction, and  other facilities   depend on electricity to function effectively. Electricity has continued  to play a significance role in the development process. In the Nigerian situation the reverse appears to be the case  because Power  outages have continued to affect the country’s  development. Some have argued that  privatizing  electricity  supply through   the unbundling of power generation arm of National Electric Power  Authority (NEPA) Now  Power Holding Company of Nigeria (PHCN) will ensure  its  efficiency . Despite this reform, electricity supply I still rationed to the consumers  in ways that are still grossly inadequate.

 

Get the Complete Project

This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $8 for international clients.

Click here to Get this Complete Project Chapter 1-5

 

 

 

 

 

You can also check other Research Project here:

  1. Accounting Research Project
  2. Adult Education
  3. Agricultural Science
  4. Banking & Finance
  5. Biblical Theology & CRS
  6. Biblical Theology and CRS
  7. Biology Education
  8. Business Administration
  9. Computer Engineering Project
  10. Computer Science 2
  11. Criminology Research Project
  12. Early Childhood Education
  13. Economic Education
  14. Education Research Project
  15. Educational Administration and Planning Research Project
  16. English
  17. English Education
  18. Entrepreneurship
  19. Environmental Sciences Research Project
  20. Guidance and Counselling Research Project
  21. History Education
  22. Human Kinetics and Health Education
  23. Management
  24. Maritime and Transportation
  25. Marketing
  26. Marketing Research Project 2
  27. Mass Communication
  28. Mathematics Education
  29. Medical Biochemistry Project
  30. Organizational Behaviour

32    Other Projects pdf doc

  1. Political Science
  2. Psychology
  3. Public Administration
  4. Public Health Research Project
  5. More Research Project
  6. Transportation Management
  7. Nursing

Education

 

See Other Essay Here

 

Full Project – FACTOR AFFECTING POWER OUTAGE IN NIGERIA