Project – An assessment of the impact of building maintenance in the economy of Nigeria

Project – An assessment of the impact of building maintenance in the economy of Nigeria

CHAPTER ONE

1.0  INTRODUCTION

1.1 BACKGROUND OF THE STUDY

Over the years, there has been increasing abandonment of building projects and infrastructural facilities which has led to the dilapidation, degradation and deterioration of these building structures within the Nigerian contemporary urban metropolis. Recently there has been a lot of research investigations and analysis of which points unshakeable to the fact that certain features such as client’s perception, costof maintenance works, unskilled maintenance technicians, inflation rates, effect of taxation on building owners, Government policies, inability to prepare and follow maintenance schedules are direct causes of neglect which leads to dilapidations and deterioration of building structures (onibokun 1997). There are also there mote causes of lack maintenance such as force majeur, cultural problems, state of the economy, the receding global economic meltdown, lack of time and general illiteracy of the occupants of the building or structure and users of the facilities. However there has also been growth in the significance of building maintenance as a proportion of the output of the construction industry which takes place against a backdrop of mounting pressure on new build activity and a growing awareness of the need to manage the condition of the nation’s building and infrastructure more effectively (chanter 2007).

Though, it is still the case that such maintenance activity takes place in a context that does not create a fully integrated approach to managing building performance and thus the full potential of many buildings and infrastructures are never wholly realized. Basically in virtually all the towns and city centers within the Nigerian, buildings and infrastructural facilities are gradually and systematically decaying, dilapidating and deteriorating with reduced or no degree of maintenance programme and activity. From a normal visual perception in the urban metropolis, it can be noted that majority of the;

(a)   Constructed buildings both private and public

(b)   Water supply systems

(c)   Sanitary and drainage systems

(e)   Transmission poles and electricity lines

1.2 STATEMENT OF THE PROBLEM

All three spheres of government, together with the state owned enterprise (SOEs), manage major portfolios of immovable infrastructural assets. While there is much emphasis on delivery of infrastructure, delivery does not in fact end with the commissioning of the infrastructural asset. Once the infrastructure has been commissioned, various activities must be carried out which are necessary to ensure that it continues to perform- such as the allocation of necessary budgets and the retention of appropriate staff to maintain the operation of the assets.“Delivery” needs to be universally understood as embracing not just constructing the infrastructure, but the appropriate operation and maintenance thereafter for thewhole design life of the asset. There are so many problems associated with the maintenance of buildings and infrastructural facilities on the economy. One of the serious problems if finance; government financing as regards to maintenance of buildings (both public andprivate) is minimal. The grant towards maintenance of infrastructural facilities ison its lowest ebb. Most buildings and infrastructures have been neglected by subsequent tenures of government while the private sectors; the individual property owners have little or nothing to contribute towards effective maintenance of their buildings, so long as the buildings affords the owner annual income he could not care less for the maintenance and so long the interior of the building is conducive for the occupants they could not care for outward appearance or other necessary maintenance activity. Another problem to effective maintenance of the built environment in Nigeria is corruption. Certain governments which have the welfare of the populace at heart will foster a well finance programme to cater for the maintenance of certain facilities such as road networks bore hole systems, bridge construction, elevation of the power grid for alleviation of suffering and eventual welfare of the populace but certain corrupted officials will channel these funds for personal aggrandizement. Another serious impediment to maintenance in Nigeria is the state of the economy, according to the united research on profitability index as regards to income per capita of nations of the world; Nigeria is rated as fifth poorest country (UN 2010), which implies that the average Nigerian lives below one dollar per day. As a result of this economic hard ship residents and citizens has little or nothing to contribute in terms of effective maintenance of their abode thus leading to neglected effects visualized in our cities and metropolis. Also certain buildings in Nigerian cities were constructed during the pre-colonialera therefore most of these buildings are aged due to wear and tear, weathering and climatic factors over the years thus resulting in dilapidated nature which might not respond positively to modern day maintenance day techniques, the reason for this assertion being 51% repair replacement strategy, such buildings, the cost of their repairs might equal over 50% cost of new construction. Buildings and infrastructural decay also stems from poor workmanship and poor supervision (Amobi 2003), most of these defects arises from the fact that the skill employed during the production of these buildings are defective, the supervisory most at times is minimal or left in the hands of unskilled foremen thus creating achasm which will be filled by unprofessional ethics thus resulting in failure in the life of the structure which will eventually be translated to the overall life span of the building/structure. This study aims to identify the shortcomings which militate against the effective maintenance of buildings and infrastructures. Therefore there is need for effective maintenance of all these buildings and infrastructures and also identify the external factors militating against effective maintenance of building and infrastructural facilities to perform its functional requirement.

1.3 AIM AND OBJECTIVES OF THE STUDY

The aim of this research work is to discover how maintenance of buildings and infrastructures can be affected, effectively to help increase the workers output thus increasing labour efficiency and increasing the income of the nation leading to increased income per capita of the populace. The objectives of this research work are as follows:

(a)   Have a proper look at the level of maintenance attention that buildings and infrastructures within Nigeria receive.

(b)   Now the current building and infrastructural maintenance practice with a view to improve on them.

(c)   To pin-point the various difficulties and problems that hamper the efficient execution of an effective maintenance management on buildings and infrastructure in Nigeria.

(d)   To examine the causes that lead to the deterioration and dilapidations of buildings and infrastructures.

(e)   To proffer solutions to the menace of lack of maintenance of buildings and infrastructures within Nigeria. In emphasis, this project will show the need for proper maintenance schemes for buildings and infrastructures, that will help reduce maintenance cost, minimize loss of use, improve safety conditions, improve aesthetic values and improve appearance of buildings thereby reduces the cases of collapse of structures and theinherent dangers to life and investment.

1.4 SIGNIFICANCE OF THE STUDY

Maintenance of buildings and the general infrastructures has not been given full recognition as an activity of primary importance in Nigeria. Maintenance activities on building and infrastructures in the country are mostly based on expediency, which over a period of time represents a series of ad hoc measures and unrelated compromise between the immediate physical needs and the availability of funds. Thus only about 15% of the total maintenance is remedied. If serious deterioration are not adequately taken care of future generations will be faced with a major capital burden. (Amobi 2003).

It is therefore imperative that maintenance activities should be increased / intensified in order to ensure that the nation’s stock of buildings ( factors of production and accommodation) which are considerable investments are used effectively as possible.

1.5 SCOPE AND DELIMITATIONS

This project work covers the entirety of maintenance as regards to buildings and infrastructures with requisite effect it has on the Nigerian nation with reference to Owerri Municipal, Imo state. From the conception, design, construction and post construction, the various problems being faced by property developers, owners, users as regards to maintenance of buildings and infrastructures. Much emphasis is placed on the infrastructural aspect of maintenance work such as social and economic infrastructure as well as scope management and its application on the scope of this project.

1.6 LIMITATION.

Enough effort has been put to exhaust the scope aforementioned but time and cost constraint relative to the magnitude of maintenance problems are the major forms of limitations for the total achievement of the project objective.

1.7 RESEARCH QUESTIONS

This research work aims to answer these questions

  • What is building maintenance and infrastructural?
  • What are the direct effects of lack of maintenance to buildings and infrastructures?
  • Does lack of maintenance affect the economy of Nigeria as a nation?
  • What are the direct causes of poor maintenance value in Nigeria?
  • Does poor maintenance value affect the Nigerian citizenry? How? And why?
  • Is poor maintenance value as a result of illiteracy, negligence, contractor’s failure as regards to materials, labour and supervision failure, design failure or activities of the occupants? These and many more are some of the questions this research work aims to satisfy.

1.8 DEFINITION OF TERMS

Definition of maintenance as regards to buildings and infrastructures Maintenance is a generic term to include planned maintenance, repair and reimbursement and provision of replacement of the structure. The goal of maintenance is to sustain the life of major assets whether building or infrastructure. (According to a training workshop on maintenance of infrastructures between 28 march – 1st April 2011 in kuala lumpur, Malaysia. Organized by International science, technology and innovation centre for south-south co-operation under the auspices of UNESCO). British standard(BS 583) (1974) define maintenance as the combination of all technical and associated administrative actions intended to retain an item in, or restore it to, a state in which it can perform its required function. The requirement for maintenance must not be less than those necessary to meet the relevant requirements and ‘maintained’ is defined in factories act 1961 as “maintained inan efficient state, in efficient working order and in good repair “According to British Standard (BS 3811) maintenance is defined as “works undertaken in order to keep or restore every facility i.e. every part of a building, site and concept to an acceptable standard”. An acceptable standard in building terms is one which sustains the utility and value of the facility. Chartered institute of building (C.I.O.B) UK (1982) went forward to use this definition on maintenance “works undertaken to keep, restore or improve every facility i.e. every part of the building, its services and surroundings to agreed standards determined by the balance between need and available resources. Obiegbu M.E. (1998) defined maintenance as a programmed transformation of a building fabric and services, reflecting changes in pattern of use and technology. Amobi C.O (2006) opined that “maintenance could be defined in engineering terminology as the continuous upkeep, in good condition of a system(s) to achieve operational reliability with maximum design output result, endurance and stability. This definition has been adapted for building maintenance as work undertaken to keep or restore every facility, that is, every part of a site, building and content to acceptable standard. Thus maintenance aims at retaining components, equipment as well as the entire structure at specified level of performance. The acceptable standard inferred must be no less than statutory requirement and one which sustains the facility and the value of the facilities. This may include a degree of improvement over the life of the building as acceptable comfort and amenity standards rise.

Project – An assessment of the impact of building maintenance in the economy of Nigeria

Click here to Get The Complete Research Project Chapter 1-5

RESEARCH PROJECT CONTENTS
CHAPTER ONE - INTRODUCTION
1.1 Background of the study
1.2 Statement of problem
1.3 Objective of the study
1.4 Research Hypotheses
1.5 Significance of the study
1.6 Scope and limitation of the study
1.7 Definition of terms
1.8 Organization of the study
CHAPETR TWO – LITERATURE REVIEW
2.1. Introduction
2.2. Conceptual Framework
2.3. Theoretical Framework
2.4 Empirical Review
CHAPETR THREE - RESEARCH METHODOLOGY
3.1 Research Design
3.2 Study Area
3.3 Population of the Study
3.4 Sample Size and Sampling Technique
3.5 Instrument for Data Collection
3.6 Validity of the Instrument
3.7 Reliability of the Instrument
3.8 Method of Data Collection
3.9 Method of Data Analysis
3.9 Method of Data Analysis
3.10 Ethical Considerations
CHAPTER FOUR - DATA PRESENTATION AND ANALYSIS
4.1. Introduction
4.2 Demographic Profiles of Respondents
4.2 Research Questions
4.3. Testing of Research Hypothesis
4.4 Discussion of Findings
CHAPTER FIVE – SUMMARY, CONCLUSION & RECOMMENDATIONS
5.1 Introduction
5.2 Summary
5.3 Conclusion
5.4 Recommendation
REFERENCES
APPENDIX


Frequently Asked Questions | PenViewWriting.com

Frequently Asked Questions

How do I get my choice complete project on any topic?
To get your choice of complete project on any topic, simply click on the Download button above. Once you do that, follow the simple procedure stated on the page to complete the process. The steps are easy and straightforward, ensuring you can quickly access the full project without stress. You may be required to provide some basic details or confirm your selection before the download begins. After completing the procedure, the project will be available for you to save on your device. This method guarantees you receive the exact project topic you want in a complete, ready-to-use format.
I have a fresh topic that is not on your website. How do I go about it?
If you have a fresh topic that is not listed on our website, don’t worry—you can still get a complete and well-prepared research project. All you need to do is chat with us directly on WhatsApp or contact our Instant Help Desk. Once you share the details of your topic, our team of experts will guide you through the process and provide a custom-written research project tailored specifically to your requirements. This ensures that even if your topic is new, unique, or uncommon, you will still receive a high-quality, original project that meets your academic needs.
How fast can I get this complete project on any project topic?
You can get your complete project very quickly, depending on your needs. If you want this exact project topic without any adjustments or modifications, it will be ready for you to download within 15 minutes. The process is fast, simple, and convenient, ensuring you don’t waste time waiting. However, if you require some changes, customization, or a fresh project written from scratch, the delivery time may take a little longer, depending on the scope of work involved. Either way, we are committed to ensuring you get your complete project promptly to meet your academic deadlines.
Is it a complete research project or just materials?
It is a Complete Research Project, not just research materials or excerpts. This means you will receive everything you need in a standard academic project format. Specifically, the package includes Chapters 1 to 5, a well-written Abstract, a detailed Table of Contents, complete References, and where applicable, Questionnaires or Secondary Data. Each section is carefully structured to meet academic requirements, making it suitable for submission or further customization. So, when you download, you’re not just getting scattered notes but a fully developed research project that is ready for use, study, or adaptation to your specific academic needs.
What if I want to change the case study for this topic?
If you would like to change the case study for this topic, it’s very easy. Simply chat with our Instant Help Desk now via +234 708 7083 227, and you will get an immediate response. Our team will assist you in modifying the project to reflect the new case study of your choice. This ensures the content remains relevant and tailored to your academic requirements. Whether you want to switch to a different organization, location, or sample population, our experts will make the necessary adjustments promptly, so you still receive a complete and well-structured research project without any hassle.
How will I get my complete project?
Your Complete Project Material will be delivered directly to your email address for easy access and use. The file will be sent in Microsoft Word document format (MS Word), which allows you to easily read, edit, and customize the content to suit your specific requirements. This format is widely accepted for academic work and ensures you can make adjustments such as changing the case study, updating references, or adding personal inputs if needed. Once the project is sent, you can download it to your device immediately and begin working with it without any extra steps or complications.
Can I get my Complete Project through WhatsApp?
Yes! You can also receive your Complete Research Project directly through your WhatsApp number for convenience. Once your project is ready, we can send the full material in MS Word format straight to your WhatsApp, making it quick and easy for you to download and access on your phone or computer. This option is especially helpful if you prefer instant delivery, faster communication, or easier access on mobile devices. Whether through email or WhatsApp, you will still get the same complete project—including all chapters, abstract, references, and questionnaires where applicable—delivered securely and without delay.
What if my Project Supervisor made some changes to a topic I picked from your website?
If your project supervisor has made some changes to the topic you picked from our website, there is no need to worry. Simply call our Instant Help Desk now on +234 708 7083 227, and you will get an immediate response. Our team will assist you in adjusting the project to reflect your supervisor’s corrections or modifications. Whether it involves rephrasing the topic, changing the case study, or adding specific requirements, we will make the necessary updates quickly. This ensures your project aligns perfectly with your supervisor’s expectations while still maintaining a complete, high-quality research structure.
Do you assist students with Assignment and Project Proposal?
Yes! We also assist students with Assignments and Project Proposals in addition to complete research projects. If you need help with writing, structuring, or editing your proposal or assignment, our team is ready to guide you and provide the necessary materials. Simply call our Instant Help Desk now on +234 708 7083 227, and you will be attended to immediately. We provide professional support to ensure your work meets academic standards, whether it’s a proposal for approval, a class assignment, or a full project. This way, you can save time, reduce stress, and achieve excellent results.
What if I do not have any project topic idea at all?
Smiles! 😊 We’ve totally got you covered if you don’t have any project topic idea at all. Our team specializes in helping students brainstorm and select suitable topics that align with their field of study, interests, and academic requirements. All you need to do is chat with us on WhatsApp now via +234 708 7083 227 to get instant help. We will provide you with a list of well-researched, relevant, and trending project topics to choose from. Once you make your choice, we’ll guide you through the next steps, ensuring you get a complete project tailored just for you.
How can I trust this site?
You can trust this site because we are genuine and duly registered with the Corporate Affairs Commission (CAC), which gives you confidence that we are a recognized and legitimate business. In addition, our platform is protected with Secure Sockets Layer (SSL) encryption, meaning all your personal details, communications, and financial transactions are highly secure and safe from unauthorized access. Over the years, we have successfully assisted thousands of students with research projects, proposals, and assignments, building a solid track record of reliability. With these measures in place, you can be assured of our credibility, professionalism, and commitment to your academic success.
Customer Testimonials | Https://azresearchconsult.com.ng

Our Customers are Happy

Ademola A.

★★★★★

I was skeptical at first, but after placing my order, my full project arrived in my email in under 15 minutes! The process was smooth, clear, and professional. Truly amazing service!

Kwabena K.

★★★★★

I needed a custom project on a new topic. Https://azresearchconsult.com.ng delivered within 3 days, and the quality was outstanding. They even guided me on how to defend it. Highly recommend!

Michael H.

★★★★★

Fast, reliable, and very professional. My research project was delivered on time, with no hidden charges. The team is trustworthy and supportive.

Fatou B.

★★★★★

I got my full project in minutes and my custom request within 3 days. Their communication is clear, and the material is top-notch. Excellent experience!

James O.

★★★★★

https://azresearchconsult.com.ng is a lifesaver! My project was delivered exactly as requested. The team is friendly, professional, and highly responsive. Very satisfied!

Ngozi E.

★★★★★

I was worried about paying online, but the team reassured me and delivered my complete project instantly. Transparent and professional service!

Ama S.

★★★★★

I requested a custom topic project and received it in just 3 days. The guidance and quality were excellent. I recommend azresearchconsult.com.ng to everyone!

Sarah W.

★★★★★

The service is dependable and efficient. My project arrived on time, and every step was transparent. Truly a professional service I trust.

Emmanuel T.

★★★★★

Fast and reliable. My full project was delivered in minutes, and the custom project in 3 days. Communication was excellent throughout.

Aisha N.

★★★★★

Extremely satisfied with the service. My project was delivered promptly, fully transparent, and of high quality. A trustworthy academic partner!