ABSTRACTAfter detailed study on machines and levers, the construction work started as follows:-

Making out, pattern development, cutting filling, drilling, machining, assembling, welding and finishing.  Detailed procedures carried out are located at the sequence of operation in subsequent pages.

The machine has scale of 1:5 in all parts of its dimensions.  However, brief dimensions are given below:-

Upper surface of bowl                        –                       850mm

Inner surface of bowl              –                       335mm

Stand height                                        –                       325mm

Diameter of wheel                              –                       250mm

Diameter of shaft seating and the shaft          4mm

Thickness of type                                –                       75mm

The drawing of the project was done and enclosed at the end page of this booklet.  At last, a 150kg capacity of conveying machine was constructed.

TABLE OF CONTENTS

CHAPTER ONE

Introduction

Historical Background

1.2              Need For Constructing The Machine

CHAPTER TWO

Theory/Literature Survey

2.1              Types Of Load To Be Carried By The Conveyor

2.2              Operation Of The Wheel-Barrow

CHAPTER THREE

3.1              Equipments/Tools Employed During

Construction Of The Wheel-Barrow

3.2              Materials Of Construction

3.3              Construction Procedure

3.4              Sequence Of Operation

3.5              Design Calculations

3.6              Calculations Basic On The Bowl

3.7              Specifications

3.8              Project Drawing

CHAPTER FOUR                                                                                       

COSTING OF PORTABLE WHEEL-BARROW                                              

4.1              Material Cost Analysis

4.2              Labour Cost Analysis

CHAPTER FIVE

5.1              Discussion

5.2              Precautions taken during construction

5.3              Cautions to users

5.4              Recommendations

5.5              Conclusions

References

CHAPTER ONE

INTRODUCTION

HISTORICAL BACKGROUND

Few centuries ago, the task of conveying loads around was so cumbersome.  Very minor loads could be carried from one point of the other.  The distances covered during the period of weak was less whereas the time expended on the short covered distance was much.  Also, there were no appreciable accomplishment of words, there were continually loss of man-power as much effort and energy was spent on conveying loads.

Loads were carried on human heads which was generally unsafe.

Consequent upon these limitations, man started devising means on how loads could be carried from one point to another with ease.  Before 13trh century, wheel-barrow was first constructed in china.  The type of wheel-barrow then had its wheel under the cargo box.  This conveyor helped the Chinese then to execute most of their works.  But, yet, smaller quantity barrow due to the weak mechanical strength of material for continuation.

In 13th century proper an improvement on the type of wheel-barrow that were in China was constructed and used in Europe.  This type had its wheel at the front of the machine on like that of the Chinese which had its wheel at the back of the cargo.  These conveyors in those days could only convey less loads and could withstand less stress due to the deficiencies in the strength of the materials used for construction.

But, as time went on, there was and have been improvement and advancement in technology and there is how knowledge on how mechanical strength of construction materials can be improved thus, guaranteeing capability of machines to the function they are intended for.

1.2              NEED FOR CONSTRUCTING THE MACHINE

The need of constructing this machine conveyor, arose as a result of difficulty being encountered daily on carrying of loads from points to points.  By the construction of this conveyor, loss of man-power, money, time and difficulties encountered during load conveying is reduced.

To establish a convincing fact in terms of technological acquired knowledge.

To contribute to technological advancement of the society.

To leave a legacy for the upcoming and prospective Engeers.

Get the Complete Project

This is a premium project material and the complete research project plus questionnaires and references can be gotten at an affordable rate of N3,000 for Nigerian clients and $8 for International clients.

Click here to Get this Complete Project Chapter 1-5

 

 

 

 

You can also check other Research Project here:

  1. Accounting Research Project
  2. Adult Education
  3. Agricultural Science
  4. Banking & Finance
  5. Biblical Theology & CRS
  6. Biblical Theology and CRS
  7. Biology Education
  8. Business Administration
  9. Computer Engineering Project
  10. Computer Science 2
  11. Criminology Research Project
  12. Early Childhood Education
  13. Economic Education
  14. Education Research Project
  15. Educational Administration and Planning Research Project
  16. English
  17. English Education
  18. Entrepreneurship
  19. Environmental Sciences Research Project
  20. Guidance and Counselling Research Project
  21. History Education
  22. Human Kinetics and Health Education
  23. Management
  24. Maritime and Transportation
  25. Marketing
  26. Marketing Research Project 2
  27. Mass Communication
  28. Mathematics Education
  29. Medical Biochemistry Project
  30. Organizational Behaviour

32    Other Projects pdf doc

  1. Political Science
  2. Psychology
  3. Public Administration
  4. Public Health Research Project
  5. More Research Project
  6. Transportation Management
  7. Nursing

Education

Full Project – CONSTRUCTION OF PORTABLE WHEEL – BARROW